Know what every hall, cold room and charger uses.
Warehouse parks run on electricity: cold rooms, lighting, HVAC, forklift and EV charging, and more and more rooftop PV. BOX2M meters every circuit without stopping operations, bills each tenant from real data, raises the alarm when a cold room drifts, and lets the site stop exporting when prices go below zero.

Shared connections, cold chains, midday solar.
Many tenants, one connection
Tenants share the grid connection, the roof and the common areas, and each expects a fair bill.
Cold that can't fail
A cold room that drifts overnight, or a dock door left open, can cost a full load of stock.
Solar at midday, prices below zero
Rooftop PV exports most when day-ahead prices drop below zero, and every exported MWh then costs money.
New chargers, old connection
EV and forklift chargers add peaks the grid connection was never sized for.
What BOX2M measures, stage by stage.
From the grid connection to the loading dock. Every stage feeds the same data model in the cloud.
Grid connection
kWh · kW · kvarh · PQImport, export and power quality at the main board or the MV/LV substation.
Rooftop PV and battery
kWh · kW · SoCProduction per inverter group and battery state of charge, with a second control path to the battery.
Cold rooms
kWh · °C · %RHTemperature and humidity per room, compressor energy, alarms.
Halls and common areas
kWh · on/offLighting and HVAC per hall, switched manually or on a schedule.
EV and forklift charging
kWh · kWCharging per circuit, shifted by playbook when prices go below zero.
Tenants
kWh · m³Electricity and water per tenant unit, read automatically for re-billing.
Six things warehouse parks do with BOX2M.
Cold rooms under watch
Temperature, humidity and compressor energy per room, with alarms by SMS, WhatsApp and voice call.
ApplicationEvery tenant billed from real data
Electricity and water per tenant, checked against contractual maximums and ready on your billing day.
ApplicationNo export at negative prices
Playbooks read day-ahead prices and charge the battery, shift load or curtail PV for the affected quarter-hours.
ApplicationCharging without new peaks
EV and forklift chargers metered per circuit. Peaks raise an alarm, and chargers switch manually or by playbook.
ApplicationWater and fire-safety lines
Clamp-on probes on water and fire-safety lines, existing meters read as they are. Night-time flow raises an alarm.
ApplicationMeasure before you add PV or chargers
Mobile electrical kits measure the main board for two weeks before you size PV, a battery or new chargers.
ApplicationThe numbers a warehouse park runs on.
Per m², per tenant, per cold room and per quarter-hour, updated every minute in the cloud and reported in PDF or CSV. The same data goes to your ERP, CAFM or invoicing over API.
Example values for a demo warehouse park.
Across logistics sites.
Read more.
Facility and property managers
One-pager: any building type, dispatching control, OPCOM and ENTSO-E, VPP feeder.
Property solution
Tenant re-billing, a typical configuration, how a project runs.
PV, BESS and hybrid C&I sites
Negative prices, a second path to the battery, a typical configuration.
Tell us about your park.
A list of your meters, tenants and chargers, or a single-line diagram, is enough to start. One of our engineers answers within one business day.